Q-2, r. 35.4 - Regulation respecting halocarbon destruction projects eligible for the issuance of offset credits

Full text
46. The verification of a project report must include a visit by the verifier to each facility where halocarbons are destroyed as part of the project, except if such visit is part of a verification during the 2 previous reporting periods included in a same eligibility period.
In addition, the verification of the project report produced for the first reporting period of an eligibility period must include a visit of every facility where halocarbons are extracted from foam.
The visit of the facilities must enable the verifier, in particular, to observe the proper conduct and operation of the project and any change made to the project since the preceding verification. During the visit of a facility, the verifier must be accompanied by the promoter or the person responsible for the facility.
M.O. 2021-06-11, s. 46.
In force: 2021-07-15
46. The verification of a project report must include a visit by the verifier to each facility where halocarbons are destroyed as part of the project, except if such visit is part of a verification during the 2 previous reporting periods included in a same eligibility period.
In addition, the verification of the project report produced for the first reporting period of an eligibility period must include a visit of every facility where halocarbons are extracted from foam.
The visit of the facilities must enable the verifier, in particular, to observe the proper conduct and operation of the project and any change made to the project since the preceding verification. During the visit of a facility, the verifier must be accompanied by the promoter or the person responsible for the facility.
M.O. 2021-06-11, s. 46.